-
Recent Posts
Archives
Categories
Meta
Tag Archives: Pulangi IV HEP
Post-Pulangi IV Rehab: What Now?
The National Grid Corporation of the Philippines (NGCP), operator of the three main power grids of the country has declared in its website a negative 197 mw (-197 mw) system reserve for the Mindanao grid, this even after the huge … Continue reading
Posted in Uncategorized
Tagged Mindanao power shortage, NGCP, NPC, power crisis, Pulangi IV HEP, rotating brown outs
Leave a comment